Jump to content
jduggan118

Working in Parallel with V7 installation

Recommended Posts

I've just upgraded to version 8. The installation went smoothly, but I've got some questions about how the product coexists with Version 7. I opened my v7 project to convert and that went smoothly, but a backup defaulted back into the v7 directory. I've gotten an upgraded project in the V8 project directory and have forced a backup into V8 backup, but during the backup I still see lots of references to V7 directories. I suspect I am missing some settings that change where the files are saved and where the V8 project looks for tags and so on. What have I missed?

 

Jim

Cary NC

Share this post


Link to post
Share on other sites

Cary,

 

Sounds like you need to go to Preferences > Current Program Options > Advanced and update the paths there. I thought those were supposed to update when you restored, but maybe I've got that wrong.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×